Detail
- Ref Number: V155
-
Price: Price on Request
- Area (m2) : 120 m2
- Bedrooms : 3
- Bathrooms : 2/3
- Garages : no
- Year Built : 2026
- Flooring : 1/2
Featured
Marina di Pietrasanta. 4 villas in Marina di Pietrasanta. Construction will begin between December 2026 and March 2027, with completion scheduled for June 2028 and September 2028. A swimming pool can be built upon request. Composed as follows:
- Villa 1: Commercial Area:
- Ground and First Floor: 117.32 sq m
- Porch: 14.04 sq m
- Terrace-pergola: 15.06 sq m
- Swimming Pool (upon request): 31.50 sq m
- Outdoor Area: 330.00 sq m
Description:
Ground Floor: Living room with kitchenette and direct access to the veranda with infinity pool, storage room, 1 double bedroom, 1 bathroom
First Floor: 2 double bedrooms with terrace, 1 bathroom Indoor parking spaces
- Villa 2: Commercial Area:
- Ground and First Floor: 118.21 sq m
- Porch: 14.04 sq m 14.06
- Terrace-Pergola 14.89 sq m
- Swimming pool (upon request) 31.50 sq m
- Outdoor Areas 260.00 sq m
- Description:
Ground Floor: Living room with kitchenette and direct access to the veranda with infinity pool, storage room, 1 double bedroom, 1 bathroom
First Floor: 2 double bedrooms with terrace, 1 bathroom
Indoor parking spaces
- Villa3 Commercial Areas:
- Ground and First Floor 118.21 sq m
- Porch 14.06 sq m
- Terrace-Pergola 14.89 sq m
- Swimming pool (upon request) 31.50 sq m
- Outdoor Areas 265.00 sq m
- Description:
Ground Floor: Living room with kitchenette and direct access to the veranda with infinity pool, storage room, 1 double bedroom, 1 bathroom
First Floor: 2 double bedrooms with terrace, 1 bathroom
Indoor Parking spaces
- Villa 4 Commercial Areas:
- Ground Floor 112.57 sq m
- Porch 19.22 sq m
- Terrace-Pergola 14.89 sq m
- Swimming Pool (upon request) 30.00 sq m
- Outdoor Areas 319.00 sq m
- Description:
Ground Floor: Living room with kitchenette and direct access to the veranda with infinity pool, 1 guest bathroom, 2 double bedrooms with ensuite bathrooms, 1 bedroom
Indoor parking spaces
Energy efficiency rating awaiting issue
